A useful sample approval records what was reviewed and what may proceed. Keep the approved physical sample, drawing and specification together. List unresolved items separately so an appearance approval is not mistaken for approval of every functional requirement.
For a glass collection, review form, dimensions, finish, accessory fit and packing. Add intended use, destination market and project-specific validation requirements before sampling starts.
What should a glass sample sign-off state before release?
Name the sample and drawings, identify the scope accepted and assign each open item to an owner. State explicitly whether the remaining conditions permit the next stage; an appearance sign-off should not be read as unrestricted production release.
Example sign-off wording
“Sample A / drawing R2: appearance accepted against the named physical reference. Assembly remains on hold until the selected hardware drawing is reviewed. Packing must be reviewed with the complete assembly. The project owner will record the next release decision after these items close.”
Illustrative process wording, not a customer case, inspection result or production authorization.
Apply the checklist to the candle vessel brief, diffuser bottle brief or glass shade brief. Keep the catalogue reference and actual approved sample distinct.
How do you identify the glass sample and drawing revision?
Give each sample a reference and revision. Record the date received, related drawing and artwork version. Photographs should accompany the physical sample and measured record.
State when a sample represents only part of the final scope. An undecorated shape sample may establish proportions while colour, branding and packaging remain open.
How do you record dimensions and appearance separately?
List the dimensions important to the application and agree how they will be measured. Confirm permitted variation before using those dimensions as inspection criteria. An opening that fits a lid may need closer attention than a decorative contour.
Compare colour, transparency, texture and decoration against agreed references. Define acceptable handmade variations and visible conditions requiring review. Broad words such as premium do not tell an inspector what to accept.
- Overall height, diameter and relevant openings.
- Capacity or weight targets where specified.
- Colour and finish under agreed viewing conditions.
- Logo placement and artwork revision.
What belongs in the assembly and packing review?
For a vase project, the vase opening measurement guide shows how to record the opening and the intended arrangement separately.
Check the proposed lid, diffuser accessory or lighting fitting with the glass component. Record the component references and fit criteria. Approval of one component does not establish compatibility with an unreviewed accessory.
Check the pack against the finished item. Record inserts, carton configuration and labels relevant to the order. Agree transport or handling evaluation separately: a sample box alone does not prove shipping performance.
How do you close open items before production release?
| Check | Example observation | Decision and owner |
|---|---|---|
| Appearance | Sample A was compared with the reference under the agreed light. | Accepted for appearance by the buyer. |
| Assembly | The hardware reference is still open. | Hold assembly approval. The project buyer obtains the hardware drawing. |
| Packing | The insert was reviewed with empty glass only. | The packing partner reviews the complete assembly before release. |
Record a clear decision: approved, approved with stated conditions, or revise and resubmit. Assign open items and state whether production may proceed while they remain open.
Keep appearance approval, functional validation and commercial approval distinct. Quantity, price, timing and inspection scope belong in the order record. Confirm production uses the same approved versions. Decide whether material, process, finish or accessory changes require a new sample or further validation.
Questions buyers ask
Is an email saying approved enough?
Identify the sample, revision, approved scope and remaining conditions so both parties can trace the decision.
Should I keep the approved sample?
Keep it with the specification and revision record for later comparison. Agree how buyer and supplier reference samples are identified.
Does sample approval replace inspection?
No. Sample approval defines the reference; production inspection checks the agreed scope against that reference and the order.
How do you connect the approval to the project brief?
Explore candle and fragrance glass, review our custom glass development process, or send your project brief.
Related reading: How to Choose Glass Candle Vessels for Your Brand.
Developing a fragrance range? Read our custom reed diffuser bottle buyer’s guide for bottle, closure and packaging checks.
Developing lighting glass? Use our custom glass lamp shade specification guide to prepare dimensions, mounting details and finish references.
Continue your glass sample approval brief
For a project enquiry, send the sample and drawing revisions, accepted scope, open items and their owners.